1. Nanjing Darcy Geotechnical Co., Ltd, Nanjing 210019, China
2. Gezhouba Group No. 1 Engineering, Yichang 443002, China
| Abstract: | For a project in Nanjing Jiangbei New Area, after excavation of foundation pit and foundation plate pouring, water inrush between side wall of foundation plate and wall occurred in foundation pit. At this time, the water level of confined water observation wells in 2-4 and 2-5 silty fine sand layers in foundation pit can meet the requirements of safe water level control. According to the analysis, the inrush water is inrush water from 3-4e and 3-4 coarse sand layers in deep layer. It is difficult to treat the floor slab in the pit due to the completion of construction. In order to solve the problem of water inrush in the pit, the measures of precipitation outside the pit are adopted, but precipitation causes rapid settlement of the ground in adjacent areas. In order to reduce the ground settlement, a recharge well is specially designed, the recharge test is organized, the structure of the recharge well is optimized, and the spacing between the two layers is arranged according to the test results. The problem of recirculation between pumping and recharging outside the pit is solved. Finally, settlement was successfully controlled. Without water-stop curtain, the project carries out precipitation and recharge outside the pit at the same time, which not only solves the inrush water, but also controls the settlement. In addition, the foundation pit is deep and inrush water is large. During the process, the analysis is carried out first, and then the test is carried out, so that the purpose of recharge can be achieved. It has reference value, so it is concluded in writing. |
| Keywords: | Well-up Water; Foundation Pit Dewatering; Recirculation; Settlement Control |
| DOI: | 10.57237/j.cear.2023.01.004 |
| [1] | 郑剑升, 张克平, 章立峰. 承压水地层基坑底部突涌及解决措施 [J]. 隧道建设, 2003 (05): 25-27. |
| [2] | 陈家春, 张登. 深基坑突涌事故原因及处理措施[J]. 福建建筑, 2015 (07): 114-116. |
| [3] | 车灿辉, 张智博, 刘实. 南京长江漫滩地区某深基坑突水原因分析及治理 [J]. 岩土工程技术, 2014, 28 (004): 183-187. |
| [4] | 王荣华. 某深基坑工程地下水管涌原因分析与处理 [J]. 山西建筑, 2014 (33): 60-62. |
| [5] | 主灿. 抽灌水引起地面沉降的现场及室内试验研究 [D]. 导师: 张云. 南京大学, 2019. |
| [6] | 高东. 基坑降水引起地面沉降影响性分析 [D]. 导师: 汪东林. 安徽建筑大学, 2018. |
| [7] | 刘帅君, 张扬清. 降水开挖引起地面沉降的控制措施分析[J]. 山东农业大学学报(自然科学版), 2016, 47 (05): 760-764. |
| [8] | 杨坤. 基坑降水引起地面沉降的机理分析及应用 [D]. 导师: 庞建勇. 安徽理工大学, 2016. |
| [9] | 原华, 张庆贺. 深基坑降水-回灌系统的最优化设计与应用[J]. 上海交通大学学报, 2013, 47 (09): 1424-1429. |
| [10] | 姚纪华, 宋汉周, 吴志伟, 刘震. 基于回灌法控制深基坑降水引起地面沉降数值模拟 [J]. 工程勘察, 2013, 41 (04): 30-34. |
| [11] | 王国富, 李罡, 路林海, 唐卓华, 王倩. 济南轨道交通R1线车站基坑降水回灌适宜性分析 [J]. 施工技术, 2016, 45 (01): 67-72. |
| [12] | 徐正荣, 潘伟峰, 华锦耀. 深基坑突涌抢险处置施工技术[J]. 建筑施工, 2019, v. 41; No. 340 (08): 46-47. |
| [13] | 赵峰. 深基坑承压水成因及其处理措施 [J]. 珠江水运, 2019, 000 (015): 100-101. |
| [14] | 李瑛, 胡德军, 叶向前, 等. 基于事故分析的深基坑承压水突涌机理研究 [J]. 地下空间与工程学报, 2019, v. 15; No. 114 (03): 310-315. |
| [15] | 汤建铭, 王钰. 珠江特大桥承台基坑突涌事故处理降水设计与施工 [J]. 探矿工程: 岩土钻掘工程, 2018, 45 (11): 50-55. |
| [16] | 陈忠, 钱宝源, 顾其波. 考虑承压水降水的深基坑施工变形规律研究 [J]. 宁波大学学报 (理工版), 2019, 032 (005): 65-69. |
We invite active, qualified and high profile scientists and researchers to join as Editorial Board Members.
Join UsScholars with a strong interest in reviewing are invited to join the reviewer panel to ensure the quality of the research to be published.
Join Us