中国石油化工股份有限公司九江分公司, 江西九江 332004
| 摘 要: | 某企业GE水煤浆气化装置黑水闪蒸系统采用三级闪蒸流程,将高压黑水中溶解的大量高闪气体解析出来,经换热冷凝后送往下游装置。实际生产过程中,闪蒸系统运行60天左右时,高压闪蒸系统压力、温度逐渐升高并超出正常操作范围,影响装置安全稳定连续运行,严重时装置停工,甚至造成环境污染事故。经过分析认为,流程中高压闪蒸汽冷凝器未能有效降低将闪蒸气中的热量取走,从而带来超压、超温的问题。围绕该理论,在保持装置现有流程设计的基础上,通过低成本投入,增加低压灰水回用喷淋管线。实践运用后,高压闪蒸系统运行周期由60天延长181天(单系列气化炉最长运行周期)。此次优化,高压闪蒸汽有效取热,不仅达到高压闪蒸系统降温降压的目的,也因凝液量的增加及温度的升高,有效减少除氧器0.45MPa蒸汽的消耗量,降低了装置能耗,节约年生产成本300多万元。 |
| 关 键 词: | 黑水闪蒸; 高压闪蒸气; 喷淋; 降温降压 |
| DOI: | 10.57237/j.cse.2023.03.005 |
China Petroleum and Chemical Corporation Jiujiang Branch, Jiujiang 332004, China
| Abstract: | The black water flash evaporation system of the GE coal water slurry gasification device of a certain enterprise adopts a three-stage flash evaporation process, which analyzes a large amount of high flash gas dissolved in high-pressure black water, and sends it to downstream devices after heat exchange and condensation. In the actual production process, when the flash evaporation system operates for about 60 days, the pressure and temperature of the high-pressure flash evaporation system gradually increase and exceed the normal operating range, affecting the safe and stable continuous operation of the device. In severe cases, the device may shut down, and even cause environmental pollution accidents. After analysis, it is believed that the high-pressure flash steam condenser in the process failed to effectively reduce the heat extracted from the flash steam, resulting in problems of overpressure and overheating. Based on this theory, while maintaining the existing process design of the device, low-cost investment is made to increase the low-pressure ash water reuse spray pipeline. After practical application, the operating cycle of the high-pressure flash evaporation system has been extended by 181 days from 60 days (the longest operating cycle of a single series of gasifiers). This optimization effectively takes heat from high-pressure flash steam, not only achieving the purpose of cooling and reducing pressure in the high-pressure flash steam system, but also reducing the consumption of 0.45MPa steam in the deaerator due to the increase in condensate volume and temperature, reducing device energy consumption and saving over 3 million yuan in annual production costs. |
| Keywords: | Black Water Flash Evaporation; High-pressure Flash Steam; Spraying; Cooling and Depressurization |
| [1] | 李自恩. 褐煤水煤浆气化装置运行存在的问题及技改措施 [J]. 煤化工, 2016, 44 (1): 47-49. |
| [2] | 唐宏青. 现代煤化工新技术 [M]. 北京: 化学工业出版社, 2009. |
| [3] | 孔德升, 马小刚, 郑成群. 真空闪蒸系统真空度低的原因分析 [J].化肥工业, 2016, 43 (6): 59-61. |
| [4] | 马廷卫, 孔德升. 水煤浆气化装置闪蒸热量回收技术的应用 [J]. 化肥设计, 2021, 59 (6): 49-51, 62. |
| [5] | 李志祥, 刘泽. 气化闪蒸系统关键问题的研究与优化创新[J]. 天然气化工 ( C1 化学与化工), 2017, 42 (6): 103-107. |
| [6] | 张海龙. 水煤浆气化装置闪蒸系统高闪气回收利用探讨 [J]. 中氮肥, 2020, 212 (2): 13-15. |
| [7] | 王永胜, 张士祥, 赵振新, 赵军杰, 党厦. 航天煤气化工艺高闪废蒸汽的优化利用 [J]. 河南化工, 2010, 27 (16): 83-85. |
| [8] | 何大雄, 姜晓霞, 李诗卓, 等. 不锈钢在液固双相流中的冲蚀腐蚀行为 [J]. 腐蚀科学与防护技术, 2000, 12 (5): 264-268. |
| [9] | 代厚鑫. 水煤浆气化系统结垢探讨及应对措施 [J]. 山东化工, 2021, 18 (5): 147-149. |
| [10] | 贺飞. 水煤浆气化工艺水系统运行中结垢机制探讨与煤质、工艺优化 [D]. 呼和浩特: 内蒙古大学, 2017. |
| [11] | LIANG C, GRACE J R, SHEN L G, et al. Experimental investigationof pressure letdown flow characteristics in dense - phasepneumatic conveying at high pressure [J]. Powder Technology, 2015, 277: 171-180. |
| [12] | 黄永顺, 张勇, 刘树辉. 一种气化黑水闪蒸系统 [P]. 中国专利: CN207391048U, 2022-12-27. |
| [13] | 废热锅炉流程气化工艺黑水闪蒸系统的优化研究 [J]. 大氮肥. 2022 (02). |
| [14] | 李泰山,张来,张培忠.一种黑水闪蒸系统[P]. 中国专利: CN214141664U, 2021-09-07. |
| [15] | 庞刚, 谢运旺, 詹晓青. 水煤浆气化流程高压黑水闪蒸系统 [P]. 中国专利: CN218145930U, 2022-12-27. |